These are some of the many projects we are proud to be involved in:

2017 Coast Hotel - Oliver, BC

At the Coast Hotel in Oliver we worked as a civil sub-contractor. The project involved stripping topsoil, excavating for the building, working with builders, plumbers and electricians. In the parking lot we imported a large amount of structural fill, installed sewer, water and storm services. Prepped for concrete curbs, sidewalks, and pavement.

2017 Naramata Water System Rehabilitation Project - Naramata, BC

Client: Regional District of Okanagan Similkameen
Related Links:

The 2017 Naramata Water System Rehabilitation Project involves bypassing the existing watermain and temporarily connecting the water services. After the existing watermain is bypassed we are installing a new watermain, reconnecting the services, repaving and restoring the road corridor.

2017 Rural Area Twinning Phase 1 - Osoyoos, BC

Client: Town of Osoyoos
Related Links:

Working on the highway boulevard and side streets we installed a new watermain for the Town of Osoyoos. We then reconnected the services, repaved the roads and restored the frontage landscaping.

2017 Ashley Furniture Homestore - Penticton, BC

Client: Ashley Furniture
Related Links:

Constructing the Ashley Furniture Homestore in Penticton BC we worked as a subcontractor and provided excavation and civil work. We dug for the building footings and slab, worked with plumbers and electricians, installed the water and sewer service, installed storm piping and built the roadways and parking lot.

2017 Gallagher Lake Village - Gallagher Lake, BC

Client: Gallager Lake Village
Related Links:

In Gallager Lake we constructed a 27 lot sub-division. Starting from bare land we stripped the topsoil, graded the roads, installed water, sewer and storm piping. Next we poured curb, installed underground electrical, built the roadway, and paved the roads.

View Gallery

2017 The Ridge - Penticton, BC

Client: The Ridge
Related Links:

In Penticton BC we constructed a large sub-division called The Ridge. Starting from bare land we stripped the topsoil, graded the roads, installed water, sewer and storm piping. Next we poured curb, installed underground electrical, built the roadway, and worked with Peters Bros to pave the roads.

View Gallery